CLT Architectural Design / Build

home

services

architecture

construction
management

bibliography

firm origin

contact us

c o n s t r u c t i o n    m a n a g e m e n t

 

Project:                 Union Plaza

Company:             Weber & Thompson Architects

Location:               Denver Tech Center DTC

Project Cost:        $125 Million

       Description:          Twenty four story high-rise condo with commercial space at plaza level. Seven story mid-rise office building. Plaza and three story underground parking structure. Project occupies one city block.
     
 

Project:                 Safeco Field

Company:             Hunt & Kiewitt / Joint Venture

Location:               Seattle

Project Cost:        Still Counting

Description:             Seattle Mariner’s Baseball Stadium

     
 

Project:                  Krustez Residence

Company:             Charter Construction

Location:               West Seattle

Project Cost:        $1.2 Million

Description:          The Heily Residence sits on a spectacular overlook above Elliott Bay and Duwamish Head. The building is sophisticated in all aspects of design and specification and features architectural concrete, Venetian plaster, pneumatic doors, as well as state of the art mechanical and electrical systems including integrated control systems. The building site itself is on a steep sensitive slope that required (65) auger-cast pilings to stabilize the difficult foundation system

     
 

Project:                 Group Health Cooperative

Company:             Baugh Construction

Location:               Seattle’s Capital Hill

Project Cost:        $6.5 Million

Description:          Complete fourth floor tenant build out, remodeled pharmacy and remodeled annex buildings not shown in picture.

     
 

Project:                 O’Dea High School Remodel

Company:             Baugh Construction

Location:               Seattle’s Capital Hill

Project Cost:        $500 Thousand

Description:          Four-stop elevator addition. Construction detailing matches original gothic architectural style.

     
 

Project:                 Benaroya Research Institute / Immunex

Company:             Baugh Construction

Location:               Seattle

Project Cost:        $1.75 Million

Description:          Benaroya Research Institute
For Amgen, 45,000 square feet of laboratory build-out at the Benaroya Research Institute.

     
 

Project:                 Washington Mutual

Company:             Lease Crutcher Lewis

Location:               Issaquah

Project Cost:        $350 Thousand

Description:          Washington Mutual located in the Issaquah Fred Meyer.


CLT Architectural Design/Build.
Copyright © 2001 by [CLT Architectural Design/Build]. All rights reserved.
Revised: 03/09/05 15:19:24 -0500.
Send mail to craig@cltdesignbuild.com with questions or comments about this web site.
Last modified: 01/18/05.